Skip to main content

Permitting

Permits granted by MRC Brome-Missisquoi

The MRC is responsible for granting permits for projects that require work on a watercourse and for granting certificates of approval for commercial tree cutting only.

Please select your permit request

If your request concerns:

  • A request for building/installing/improving a bridge or culvert
  • A project that could increase peak flow

Please login to the Client space to complete your request.

Otherwise, please select one of the permits below.

Select a permit

Request a certificate of approval for tree cutting

Are you an accredited forest producer? 
Property owner
Name
Address
Do you have a representative? 
Representative appointed by the owner

Note: If necessary, attach a copy of the proxy form at the end of this form.

Name
Address
Is the work being done by the property owner? 
Operator
Name
Address
Description of work

Note: Some municipalities require a certificate of wood branding from a forest engineer for areas above a certain threshold. Speak to your municipal inspector for more information.

7-digit number, available on your certificate of location

Constraints

Please indicate any constraints on the property

Constraints 
Other information

Note: Maple trees in a protected agricultural zone may only be cut with the proper forestry authorization.

Ex.: mixed, hardwood or softwood

Maple tree(s) in a protected agricultural zone (LPTAQ) 
Work done in the past ten years 

Water resources

1. If more than 1,500 m² of soil will be disturbed
Do you plan to 
What mitigation measures do you plan to use? 

Ruts and channels

Water that accumulates in ruts from heavy machinery or in the channels of a forestry road must be diverted perpendicularly away from watercourses, lakes and wetlands towards vegetation.

2. Installing a watercourse crossing
One or more watercourse crossings are required
Details

Note: For the purposes of applying the tree-cutting provisions, any permanent or intermittent flow of water will be considered a watercourse and regulatory provisions will apply. An inspection will take place prior to the issuing of the certificate in order to confirm the presence of a watercourse. A fee of $100 applies for the installation of one or more water crossings. If you checked Yes, you will receive an email with payment instructions.

Work timeline
Property owner agreement
Documents required for the request

Showing the following information: cutting site, watercourse/wetland, culvert or bridge, stacking area, main logging trails and maple trees (if in protected agricultural zone). Feel free to visit the Graphic register page of our website for a map of your municipality.

Additional documents, depending on your situation

Note: Missing information will slow down the process of issuing your certificate or even lead to your request being refused.

If you are not the property owner

If the property owner has made a change of use

Some municipalities require a certificate of wood branding from a forest engineer for areas above a certain threshold; speak to your municipal inspector for more information.

Would you like the confirmation email, including payment instructions for a water crossing if applicable, to be sent to the owner or representative? 

FAQ

Bylaws on watercourses

Before filling out a permit request for a project requiring work on a watercourse, please review Règlement 04-0416 relatif à l’écoulement des eaux des cours d’eau situés sur le territoire de la MRC Brome-Missisquoi [Bylaw 04-0416 on watercourse drainage in the MRC Brome-Missisquoi region] (BYLAW 04-0416 – Appendices E and F).

View

Bylaws on tree cutting

Before filling out a permit request for tree cutting, please review your municipality’s bylaws on zoning, permits and certificates. View your municipality’s profile to find their contact information.

View